| |||||||||
|
|||||||||

Quality Policy
, Good Design
, Scientific Management
, Total Quality Management
, Customer Satisfaction
Management Ideology
, Insist on employee basic, forge top talent
, Insist on quality first, make top products
, Insist on cost efficient, provide top service
, Insist on advanced management, enhance economic efficiency
Quality Management System
, Quality System: ISO9001: 2000 Registration, TQM, QCC & Rationalization Advice
, R&D System: Introduce integrated products development (IPD) procedure, shorten R&D cycle, and reduce R&D cost.
, Purchasing System: Introduce integrate supply chain (ISC) procedure, shorten cycle of supplying, raise - materials quality
, Manufacture System: Push SPC statistic control technology; promote the business flow reform (BPR).
QA System
Input Quality Control
Based upon a complete input inspecting criterion
Process Control
Do things right at the first time. Quality is truly everyone¨s
job. Each individual in FLT has the responsibility for defect-free operations.
Final & Output Quality Control
Institute a whole FQC and OQC criterion
Implement the defect return criterion strictly
Implement a defect handle and improve procedure
Quality analysis with control methods
Histogram Diagram
Pareto Analyze Diagram
Cause-effect Diagram
Run Chart
Flow Chart
